Identifying 30% energy savings for a UK hospital

Identifying 30% energy savings for a UK hospital

Energy savings for hospitals.

Overview

An onsite energy survey and detailed consumption analysis identified significant “quick win” savings for a UK surgical centre.

Services:

  • Onsite energy survey
  • BMS appraisal
  • Energy consumption analysis
  • Energy saving recommendations

We were asked by a UK surgical centre to identify and recommend solutions for improving energy reduction and efficiency.

Objectives

  • Gain a better understanding of energy consumption
  • Identify energy waste and opportunities for savings
  • Review plant and assets to identify improvements
  • Recommend no/low cost initiatives + capex upgrades

Project scope

We undertook an onsite review, BMS appraisal and detailed consumption analysis to identify where savings could be made. A full review of the plant operation and status of all installed assets and equipment was conducted to identify areas for improvement.

Outcomes & deliverables

Following analysis it was confirmed that the hospital’s energy consumption was 41% above expected levels (having accounted for catering and degree days). The primary causes of the excess consumption was a lack of availability of energy data for monitoring and targeting purposes, limited HVAC controls and BMS settings that did not match internal requirements or occupancy levels. It was evident that the control of building services had reduced over time and systems were not being reviewed by appropriately experienced staff.

Benefits: Following the onsite review, BMS appraisal and detailed consumption analysis, estimated savings of 33% were identified and recommended to the client.

The recommendations amounted to £200,000 in annual energy savings and this included a series of no/low-cost adjustments, such as:

  • Changes to plant start/stop times
  • Air conditioning control amendments
  • Matching space temperatures to avoid overheating
  • Behavioural change

In addition, a series of costed capex projects were put forward including:

  • Lighting upgrades
  • Monitoring and targeting
  • Voltage optimisation

Is energy waste costing your organisation?

We can help you pinpoint areas of inefficiency – and identify low or no-cost improvements. Get in touch for advice.

    Etiam magna arcu, ullamcorper ut pulvinar et, ornare sit amet ligula. Aliquam vitae bibendum lorem. Cras id dui lectus. Pellentesque nec felis tristique urna lacinia sollicitudin ac ac ex. Maecenas mattis faucibus condimentum. Curabitur imperdiet felis at est posuere bibendum. Sed quis nulla tellus.

    ADDRESS

    63739 street lorem ipsum City, Country

    PHONE

    +12 (0) 345 678 9

    EMAIL

    info@company.com

    HNTAS: New performance standards for heat networks
    are coming.

    Find out:

    – About the new standards
    – What’s in scope
    – When to comply